TRANS-GAMBIA BRIDGE SET TO BE INAUGURATED IN JANUARY 2019

TRANS-GAMBIA BRIDGE SET TO BE INAUGURATED IN JANUARY 2019

Gambia’s President assured of Trans-Gambia Bridge completion during site tour of the project. Construction of the Trans-Gambia bridge is set to be complete after the contractor inform the President. The 1.8kilometer long bridge is over five storeys high. It is design to accomodate passage of most vessels, while longer-mast boats will also easily fold their masts to pass through the bridge. The project was explain to President Barrow by Lamin Bojang, project supervisor and his team of engineers and consultants….

Read More

US$10.1M MOZAMBIQUE’S WATER PUMPING STATION INAUGURATED

US$10.1M MOZAMBIQUE’S WATER PUMPING STATION INAUGURATED

Magula water station inaugurated by President Filipe Nyusi. The Magula water station which is located in the Lower Limpopo irrigation scheme was inaugurated by President Filipe Nyusi. The water station which has the capacity to pump 2.49 cubic metres of water a second is expected to produce 5,000 tonnes of rice and 20,000 tonnes of vegetables per agricultural campaign, in addition to maize and other crops. The project which will increase in productivity and production will help guarantee food security and…

Read More